Surface Preparation - Putty
The Putty surface you are working with may have to be treated differently depending on its current state.
New / unpainted
For optimal results on a putty surface in a new / unpainted state, please follow the instructions below for preparation and application. Links to the products utilised in this guide are listed below.
- Preparation
-
- Putty must by dry for at least 7 days
- Application
-
- Apply 1 coat Ultra-BondFirst
- Apply 2 coats of Ultralast product of choice
- Products that can be used
Previously painted
For optimal results on a putty surface in a previously painted state, please follow the instructions below for preparation and application. Links to the products utilised in this guide are listed below.
- Preparation
-
- Remove loose flaking paint by brass** brushes or sanding
- Wash down with general purpose cleaner or Ultra-Clean
- Rinse with clean water
- Cracks can be filled with a filler and Ultra-BondFirst (in place of water)
- Application
-
- Apply 1 coat Ultra-BondFirst
- Apply 2 final coats of Ultralast product of choice
- Products that can be used

